Siting and configuration of storage against transmission constraint. Distributed versus transmission-level interconnection, queue positioning, and the technical argument you put in front of the network operator. 5.3 GWh developed on Duke Energy Progress corridors carrying a $238 million upgrade estimate. One project to signed interconnection.

Send us the project. The principal engineer reads every request personally and replies in writing.
Class:Utility Scale Advisory
Compliance:EN 50549-1 / EN 50549-2
Deliverables:Written connection strategy with the assumptions stated