We find what the other side's reviewer will find, while there is still time to fix it. Yield models, UL 9540A reports, design packages and capital estimates, reviewed before they reach a lender, a grant submission or a buyer.

What this is
A technical review of your own documents before they go to a lender, a grant evaluator or a buyer. We read them the way the reviewer on the other side will read them, and tell you what will not survive that reading — while there is still time to fix it.
What we review
What you get
A written review listing every finding, ranked by whether it changes the numbers, changes the design, or changes nothing. Each finding cites the document and the calculation behind it. Where a finding is a judgement call rather than an error, it is labelled as one.
Scope
This is pre-submission review, not lender-facing due diligence. We do not issue certified due diligence opinions until professional indemnity cover is in place in the relevant jurisdiction. We do not carry fire protection engineering — where a project needs thermal runaway assessment or fire safety sign-off, we say so and work alongside a fire protection engineer.
Send us the project. The principal engineer reads every request personally and replies in writing.
Class:Utility Scale Advisory
Compliance:EN European Grid Codes
Deliverables:Written reports with assumptions stated